Acosol awards €350,263 water‑pipeline contract
Acosol has awarded a €350,263 contract to Irtene SL to design and oversee construction of a 2.55‑km water‑pipeline stretch between the Galera stream and the MA‑8300 road linking Casares and the coast.

The facts, in their words
This dispatch is our summary. SUR in English did the reporting; their account is the record, and it's one click away.
SUR in English: read the original →